Based on Rostery's free billable case note template for support coordinators. There's no rostery.com.au blog post for that tool yet, so for the claiming deadline this post leans on our guide to the NDIS 90-day claim rule. The code is new and written for this post.
In most of the NDIS, a shift and its paperwork are separate things. A support worker turns up, delivers personal care, clocks out, and writes a progress note. The claim comes from the shift.
Support coordination is different. A coordinator's work is phone calls, emails, meetings, reports and visits, and the record of that work is the case note. The note says what was done, for whom, for how long and why. When the time is claimed, the note is the evidence. In practice the case note is the billing unit.
That makes it a data problem as much as a writing one. A note can be well written and still fail as a record: no NDIS number, a rounded block of time, a goal paraphrased so loosely that nobody can tell which plan goal it relates to, or a claim type the support item doesn't allow. Each of those is cheap to catch on the day the note is written and expensive to catch three months later.
From 1 December 2026, three months is roughly all you get. The time to claim an NDIS support drops from two years to 90 days, counted with the day of the support as day 1. A note that's missing something on the day it's written now has a short runway to be fixed.
This post builds a small linter for support coordination case notes. It's plain standard library Python, about 135 lines, with 15 pytest tests. It does five jobs:
- Checks the seven points a billable note needs.
- Compares the note's goal with the plan's own wording.
- Flags vague descriptions of the work.
- Works out the price from the exact minutes, and the date the claim has to be made by.
- Checks the claim type against what the bulk claim file accepts and what the item allows.
It isn't a claiming engine and it doesn't talk to the NDIA. It's the kind of check you'd run on a batch of notes before a claim run, or wire into a form so a coordinator sees the problem before saving.
What the NDIA asks of a case note
Two official sources set the floor.
The NDIA's page on record keeping requirements says every record should carry minimum identifying information: the participant's name, their NDIS number, the date or dates of the support, the amount and quantity or hours delivered, and the support type. On top of that it describes what case notes are for: a case note sets out what the participant took part in, and ties it back to two things, the support item being claimed and the goals in their plan. Progress, and what's planned for next time, can go in too.
The NDIS Pricing Schedule 2026-27 sets the price limits. Support coordination items are hourly, and the Schedule's definition of an hourly unit matters here: you claim the whole hourly limit, or a share of it, according to the minutes the support actually ran.
Rostery's template turns these into a seven-point check that runs as you type. In our words: who the participant is (name and NDIS number), when the work happened (the date plus real start and finish), which support item it's claimed under, a description of the work, the plan goal it serves, how it went, and what happens next. That list is a good spec for a linter, so we'll start there.
The data
A note is a flat record. Times are kept as the coordinator wrote them, as "HH:MM" strings, because we want to be able to see whether they look real.
@dataclass class CaseNote: participant: str ndis_number: str coordinator: str day: date start: str # "HH:MM", 24-hour finish: str item: str area: str = "national" claim_type: str = "" goal: str = "" what_was_done: str = "" outcome: str = "" next_steps: str = "" The price limits come straight from Table 56 of the Pricing Schedule. Only the four support coordination items are included. The Individualised Living Options item in the same table is left out on purpose, because it isn't a coordination item.
# Table 56, 2026-27: item -> (name, {area: hourly limit}) PRICE_LIMITS = { "07_001_0106_8_3": ("Support Coordination Level 1: Support Connection", {"national": "80.06", "remote": "112.08", "very_remote": "120.09"}), "07_002_0106_8_3": ("Support Coordination Level 2: Coordination of Supports", {"national": "100.14", "remote": "140.19", "very_remote": "150.21"}), "07_004_0132_8_3": ("Support Coordination Level 3: Specialist Support Coordination", {"national": "190.54", "remote": "266.75", "very_remote": "285.80"}), "10_002_0106_8_3": ("Support Coordination Level 2: Coordination of Supports for Employment", {"national": "100.14", "remote": "140.19", "very_remote": "150.21"}), } # Claim types the bulk file accepts. "" means a direct service (field left blank). CLAIM_TYPES = {"", "CANC", "REPW", "TRAN", "NF2F", "THLT", "IRSS"} # Claim types the support coordination items allow, per the 2026-27 Support Catalogue # as summarised on Rostery's case note template page. Check the catalogue for your item. SC_ALLOWED = {"", "NF2F", "TRAN", "CANC", "REPW"} The claim type sets are where the two official sources meet. The bulk payment request guide lists the values the ClaimType field accepts: blank for a direct service, then CANC, REPW, TRAN, NF2F, THLT and IRSS, and it says they must be capitalised. Which of those a given item allows is a separate question, answered by the item's claiming flags in the Support Catalogue. Rostery's template page summarises the 2026-27 flags for support coordination as non-face-to-face, provider travel, short notice cancellations and NDIA-required reports. If you use this for other items, load the flags from the catalogue itself rather than copying our set.
Check 1: the seven points
Each of the seven points becomes a test that either passes or produces an error. An error means the note shouldn't be claimed yet.
def seven_points(n): checks = [ ("P1", bool(n.participant.strip()) and bool(re.fullmatch(r"43\d{7}", n.ndis_number)), "participant name and an NDIS number (9 digits, starting 43)"), ("P2", bool(n.day and n.start and n.finish), "date, start and finish times"), ("P3", n.item in PRICE_LIMITS, "a support coordination item from Table 56"), ("P4", len(n.what_was_done.split()) >= 8, "what was done, in at least a sentence"), ("P5", bool(n.goal.strip()), "the goal it relates to"), ("P6", bool(n.outcome.strip()), "outcome or progress"), ("P7", bool(n.next_steps.strip()), "next steps"), ] return [Finding("error", code, "missing: " + text) for code, ok, text in checks if not ok] Two of these need a word of explanation.
The NDIS number check uses the format the bulk payment guide gives when it explains an invalid number: nine digits, no spaces, starting with 43. That catches the common mistakes, such as a number with a digit missing or a nominee's number pasted in by accident, though it can't tell you whether the number belongs to this participant.
The "what was done" test asks for at least eight words. That's our threshold, not an official one. It exists to catch notes like "Phone call" or "Admin", which are true and tell a reviewer nothing.
Check 2: the goal, in the plan's words
The template's advice is to take the goal straight from the plan, in the plan's own phrasing, so nobody has to work out the connection. A reviewer reading the note shouldn't have to guess that "housing" means "I want to move into my own place with support by the end of next year".
We can test for that with difflib. Normalise case and spacing, then compare the note's goal with each goal in the plan and keep the best similarity.
def goal_match(goal, plan_goals, threshold=0.8): """Best similarity between the note's goal and the plan's own wording (0 to 1).""" g = " ".join(goal.lower().split()) return max((SequenceMatcher(None, g, " ".join(p.lower().split())).ratio() for p in plan_goals), default=0.0) A score below 0.8 produces a warning, not an error. Coordinators sometimes have good reason to shorten a goal, and a warning keeps the decision with a person. In our tests, the plan's own wording with different capitalisation and a double space scores 1.0, and "housing" scores well under the threshold.
This is the one check that needs data the note doesn't hold: the participant's current plan goals. If your system stores goals against the participant, pass them in. If it doesn't, that's worth knowing too.
Check 3: describe the work, not the participant
One habit in the template is to describe the work rather than the participant. A note that says the coordinator rang four SIL providers about current vacancies tells a reviewer far more than one that says the client was supported.
The linter keeps a short list of patterns that tend to stand in for a description: "supported the client", "assisted the participant", "checked in", "followed up", "liaised", "as discussed", "ongoing". A match raises a warning naming the phrase. The list is ours and deliberately short. A longer list starts flagging good notes that happen to say "followed up with the OT about the report", which is a perfectly clear description.
Check 4: real minutes, real money, real deadline
The pricing is three small functions.
def minutes_between(start, finish): t0 = datetime.strptime(start, "%H:%M") t1 = datetime.strptime(finish, "%H:%M") if t1 <= t0: raise ValueError(f"finish {finish} is not after start {start}") return int((t1 - t0).total_seconds() // 60) def price(item, area, minutes): """Hourly item: a full hour or a fraction of the limit, by the exact minutes.""" limit = Decimal(PRICE_LIMITS[item][1][area]) return (limit * minutes / 60).quantize(Decimal("0.01"), rounding=ROUND_HALF_UP) def claim_by(day): """The support day is day 1, so day 90 is 89 days later.""" return day + timedelta(days=89) Minutes. We subtract the start from the finish and refuse a finish that isn't after the start. A coordination note that crosses midnight is unusual enough that we'd rather fail loudly than guess.
Price. Because the hourly unit is priced on exact minutes, 47 minutes of Level 2 coordination at the national limit is 47/60 of $100.14, which is $78.44 after rounding to the cent. We use Decimal so the money doesn't pick up floating point noise, and round half up. The Schedule doesn't say how to round a fraction of a cent, so treat that as our choice and match whatever your claiming system does.
Deadline. The Rostery guide explains how the 90 days are counted: the day of the support is day 1, so day 90 is 89 days later. A support on Tuesday 1 December 2026 has to be claimed by Sunday 28 February 2027, and one test pins exactly that date. The guide also notes that if day 90 lands on a weekend or public holiday, the safe move is to lodge on the working day before, because the NDIA hasn't said how its system counts. Our function returns the plain date and leaves the weekend decision to you.
The lint adds two timing warnings. If the start and the finish are both on the hour, it asks whether these are the real times. The template's first habit is to write the real start and finish times, because hourly items are claimed on the exact minutes, and a neat 10:00 to 11:00 is sometimes a rounded block. And if a single note runs over ten hours, it asks for a second look.
Check 5: the claim type
The last check is about the claim line rather than the note. If the claim type isn't one the bulk file accepts at all, including a lower-case "nf2f", it's an error. If it's a valid claim type that the item doesn't allow, it's also an error, and the message names the rejection you'd get back: C29, "This support item is not allowed for this claim type selection." Rostery's page on NDIA claim rejection code C29 explains it as a claim type that doesn't match what the item allows, and suggests checking the item's claiming flags.
Putting it together
The lint function runs every check and returns the minutes, the amount, the claim-by date and a list of findings.
def lint(note, plan_goals=(), plan_end=None): findings = seven_points(note) minutes = minutes_between(note.start, note.finish) if note.claim_type not in CLAIM_TYPES: findings.append(Finding("error", "CT1", f"claim type {note.claim_type!r} isn't one the bulk file accepts")) elif note.claim_type not in SC_ALLOWED: findings.append(Finding("error", "CT2", f"claim type {note.claim_type} isn't allowed for this item (expect C29)")) if note.goal and plan_goals and goal_match(note.goal, plan_goals) < 0.8: findings.append(Finding("warn", "G1", "goal doesn't match the plan's wording; quote it as the plan words it")) for pattern in VAGUE: if re.search(pattern, note.what_was_done, re.I): findings.append(Finding("warn", "W1", f"vague phrase {re.search(pattern, note.what_was_done, re.I).group(0)!r}: describe the work")) break if note.start.endswith(":00") and note.finish.endswith(":00"): findings.append(Finding("warn", "T1", "start and finish both on the hour: are these the real times?")) if minutes > 600: findings.append(Finding("warn", "T2", "more than ten hours in one note")) if plan_end and note.day > plan_end: findings.append(Finding("error", "D1", "support date is after the plan end date")) amount = price(note.item, note.area, minutes) if note.item in PRICE_LIMITS else Decimal("0") return Result(minutes, amount, claim_by(note.day), findings) Here's a run over three invented notes for an invented participant, with plan goals about moving out of home and getting back to swimming.
2026-12-02 10:05-10:52 47 min $78.44 claim by 2027-03-01 ready to claim 2026-12-03 14:00-15:00 60 min $100.14 claim by 2027-03-02 hold error P7 missing: next steps warn G1 goal doesn't match the plan's wording; quote it as the plan words it warn W1 vague phrase 'Supported client': describe the work warn T1 start and finish both on the hour: are these the real times? 2026-12-04 09:10-09:40 30 min $50.07 claim by 2027-03-03 hold error CT2 claim type IRSS isn't allowed for this item (expect C29) The first note passes: real times, the goal in the plan's words, a description of the work, an outcome and next steps. It's worth $78.44 and has to be claimed by 1 March 2027.
The second is the kind of note that gets written at the end of a long day. It has no next steps, so it's held. It also gets three warnings: a paraphrased goal, a vague description and a suspiciously round hour.
The third is a good note with a bad claim line. IRSS is a real claim type, but it's for irregular SIL supports, so a coordination item would come back with C29.
Tests
The tests pin the behaviour that matters most when someone edits the code later: the exact-minute price at three limits, the day-1 counting rule, the backwards-time error, a clean note producing no findings, each of the blocking checks, and each warning on its own.
def test_exact_minutes_price(): assert price("07_002_0106_8_3", "national", 47) == Decimal("78.44") assert price("07_002_0106_8_3", "national", 60) == Decimal("100.14") assert price("07_004_0132_8_3", "very_remote", 90) == Decimal("428.70") def test_claim_by_counts_support_day_as_day_one(): assert claim_by(date(2026, 12, 1)) == date(2027, 2, 28) def test_claim_type_not_allowed_for_item(): r = lint(good(claim_type="IRSS"), PLAN_GOALS) assert [f.code for f in r.findings] == ["CT2"] All 15 pass. When the 2027-28 Pricing Schedule is published, the first test is the one that should break, which is the point.
A design note: lock the time once it's claimed
A linter catches problems before a claim. The other half is what happens after. Once a note's time has gone into a claim file, quietly editing the minutes leaves the record and the claim disagreeing.
Rostery's own support coordination case notes handle this by treating the note as the billing unit. Logging time is writing the note, and the time is priced when it's saved. The note text can still be edited, with every version kept, but the time locks once its claim file or invoice is downloaded or sent, or its pay is marked paid. After that it changes only through an adjustment with a reason. Whatever you build, that split between editable words and locked time is worth copying.
Two related pieces of the same picture: the support coordination hours calculator shows the hours still available in a coordination budget and the weekly pace that gets you to the plan's end date, and the plan review report template is where all these notes end up being summarised before a reassessment.
What this doesn't do
- It doesn't decide whether the work was coordination. No linter can tell whether an hour of phone calls was reasonable and necessary. It can only make sure the record says what happened.
- It doesn't apply travel rules. The template page points out that, for coordinators, the 2026-27 Schedule gives price limits without travel caps, and that the NDIA has said updated guidance is coming. Travel goes on its own TRAN line and should follow whatever the current guidance says.
- It doesn't check the participant's budget. A clean note can still exceed what's left in the plan.
- It doesn't replace the support log. For support coordination, the NDIA's guide to documentation by support type expects three records: the notes, a signed support log and a service agreement. This only covers the first.
If you'd like the plain-English version without code, our Blogger post on what a support coordination case note needs before you claim the time covers it. And if your claim lines are built from item numbers in code, our earlier dev.to post on parsing NDIS support item numbers is the natural companion to this one.
Sources
- NDIA, What are the record keeping requirements (minimum identifying information; case notes), read 22 and 27 November 2026.
- NDIS Pricing Schedule 2026-27, Appendix 6, Table 56 (support coordination price limits) and Part 4 (hourly unit definition).
- NDIA, Bulk payment requests self-help guide for providers (December 2025): ClaimType values and capitalisation; NDIS number format (9 digits, starting with 43); rejection code C29.
- NDIS Act 2013, section 45A(5)(a) as amended from 1 December 2026 (90 days), as explained in Rostery's NDIS 90-day claim rule guide, read 27 November 2026.
- Rostery, Billable case note template (seven-point check, five habits, Support Catalogue flags), read 27 November 2026.
- The participant, coordinator, NDIS number and notes in the examples are invented. The eight-word minimum, the vague phrase list, the 0.8 goal threshold and the rounding are our choices.


