Every side project I start reaches the same awkward point: it works, mostly. It's not polished, it's not finished, and it's not embarrassing either. And then I have to decide — ship it now, shelve it for later, or kill it and move on.
Shipping feels right until I remember the rough edges. Shelving feels safe until 'later' never comes. Killing it feels wasteful after all those evenings.
So I'm curious how other builders decide. Do you have a rule — a date, a feature list, a 'good enough' checklist? Or is it a gut call every time? And what happened the last time you picked wrong — shipped too early, or shelved something that deserved to go out?

