arXiv:2611.25223v1 Announce Type: new Abstract: Winter storm outages on rural distribution feeders may leave electrically heated houses cooling below acceptable indoor temperatures. This paper proposes a two-stage stochastic mixed-integer linear program for pre-storm crew placement that considers the building cooling deadline. Crews are placed before the storm, and repairs and reconnection are scheduled in each damage scenario to minimize the expected cost. Specifically, outage house-hours beyond the deadline are penalized, and feeder voltage and loading constraints account for cold load pickup at each reconnection. A case study on a synthetic rural feeder shows that the penalty shifts one of two crews toward a remote village, reducing expected house-hours beyond the deadline by 39 percent for 5.3 percent more outage house-hours. With three crews, the penalty does not change crew placement. Immediate reconnection would violate the voltage limit in four of six scenarios.
Source:https://arxiv.org/abs/2611.25223PreviousReliability-based Sizing of Energy Storage for Large Load IntegrationNextData-driven Linearization of Operational Dynamics of Soft Open Points in Power Distribution Networks
Related posts
I gave AI agents access to my work and home. Here's what broke
0dev.to

How I Replaced Heavy Scraping Stacks with Pure Python Stdlib (+ Live Interactive HTML Reports)
0dev.to
The Alert Said 'Not Applied in Production' — a Nightly Timer Had Already Done It, One Hour Earlier
0dev.to
How to Build a Smarter Flight Price Comparison UI with JavaScript
0dev.to
Hi DEV 👋 I'm Deependra, building production AI systems
0dev.to

Borsa Verisi Akışındaki Gürültüyü Temizleyen Bir Python Aracı Yazdım
0dev.to