Backend
Stochastic Crew Placement for Winter Storm Restoration of Rural Distribution Feeders Considering Building Cooling Deadlines
arXiv cs.SY0 views
arXiv:2611.25223v1 Announce Type: new Abstract: Winter storm outages on rural distribution feeders may leave electrically heated houses cooling below acceptable indoor temperatures. This paper proposes a two-stage stochastic mixed-integer linear program for pre-storm crew placement that considers the building cooling deadline. Crews are placed before the storm, and repairs and reconnection are scheduled in each damage scenario to minimize the expected cost. Specifically, outage house-hours beyond the deadline are penalized, and feeder voltage and loading constraints account for cold load pickup at each reconnection. A case study on a synthetic rural feeder shows that the penalty shifts one of two crews toward a remote village, reducing expected house-hours beyond the deadline by 39 percent for 5.3 percent more outage house-hours. With three crews, the penalty does not change crew placement. Immediate reconnection would violate the voltage limit in four of six scenarios.
Source:https://arxiv.org/abs/2611.25223PreviousReliability-based Sizing of Energy Storage for Large Load IntegrationNextData-driven Linearization of Operational Dynamics of Soft Open Points in Power Distribution Networks
Related posts
What Is Futures Earn and How Does It Work for Traders?
0HackerNoon
How to Scrape Eventbrite Events with Python (Prices and Organizers Included)
0dev.to

Plug-and-Play Authentication with Keycloak in Python
0dev.to
We halved a wait by shortening a poll — and kept the case that didn't fit
0dev.to
Half the shops that advertise their PHP version run one that is past end of life
0dev.to
I ran 107 commands from real Claude Code incident reports through my pre-run check. Here is where it stays silent.
0dev.to