Fire alarm battery calculations get rejected for the same handful of reasons over and over: the standby duration is wrong, the aging margin is missing, or nobody can trace the number back to a device list. The calculation itself is not hard. This is the whole method, with the math shown.
What NFPA 72 actually requires
NFPA 72 (the secondary power rules live in Chapter 10 in the 2016 and later editions) requires the secondary power supply, usually sealed lead-acid batteries, to carry the system in two stages:
- Standby (quiescent) load for a set number of hours, then
- Full alarm load for a set number of minutes at the end of that standby period.
The durations depend on the system type:
| System case | Standby | Alarm |
|---|---|---|
| Non-voice fire alarm system | 24 hours | 5 minutes |
| Emergency voice/alarm communications (EVACS / mass notification) | 24 hours | 15 minutes |
| System backed by an on-site generator | 4 hours | 5 minutes |
Check the edition your AHJ enforces. Clause numbers and durations have moved between editions, so treat this table as the current common cases and confirm against your copy.
The formula
Required capacity in amp-hours:
Ah = ( I_standby x t_standby + I_alarm x t_alarm ) x 1.25 -
I_standbyis the sum of every device's quiescent (standby) current, in amps. -
t_standbyis the standby duration in hours (24, or 4 with a generator). -
I_alarmis the sum of every device's alarm current, in amps. This is where the notification appliances (horns, strobes, speakers) dominate. -
t_alarmis the alarm duration in hours: 5 minutes = 0.0833 h, 15 minutes = 0.25 h. -
1.25is the aging margin. Batteries lose capacity as they age, and a 25% margin is the standard practice reviewers expect to see. Skip it and your calculation sizes the battery for day one, not year three.
Worked example: small office building, non-voice system, 24 V panel
Device list (currents from the datasheets of the actual devices on the project - never from memory):
| Device | Qty | Standby current each | Alarm current each | Standby total | Alarm total |
|---|---|---|---|---|---|
| FACP | 1 | 300 mA | 400 mA | 0.30 A | 0.40 A |
| Smoke detectors | 30 | 0.3 mA | 0.3 mA | 0.01 A | 0.01 A |
| Monitor/control modules | 20 | 7 mA | 10 mA | 0.14 A | 0.20 A |
| Horn-strobes | 10 | - | 80 mA | - | 0.80 A |
| Communicator (DACT) | 1 | 50 mA | 100 mA | 0.05 A | 0.10 A |
| Totals | 0.50 A | 1.51 A |
Now the two stages:
Standby: 0.50 A x 24 h = 12.00 Ah Alarm: 1.51 A x 0.0833 h = 0.13 Ah Subtotal: 12.13 Ah With margin: 12.13 x 1.25 = 15.16 Ah Next common SLA battery size up: 18 Ah. The panel is a 24 V system and the batteries are 12 V, so the answer is two 12 V 18 Ah batteries in series. Series adds voltage, not capacity: the pair is still 18 Ah.
The mistakes that get these rejected
- No aging margin. 12.13 Ah "passes" a 12 Ah battery on paper. Reviewers bounce it. Apply the 1.25 factor.
- Sizing on alarm current only. The standby term is usually 95% of the answer. In this example, 12.0 of the 12.13 Ah comes from standby.
- Forgetting series batteries don't add Ah. Two 12 V 18 Ah batteries in series give you 24 V at 18 Ah, not 36 Ah.
- Using catalogue-typical device currents. A horn-strobe can draw 30 mA or 300 mA depending on candela setting. Use the datasheet values for the devices and settings actually on the project.
- Stopping at the number. A complete submittal also checks the charger capacity, the physical cabinet space for the batteries, temperature conditions, and the annual load test. The capacity number is one line of the review.
A spreadsheet that does this for you
I design fire alarm and ELV systems for a living, and I got tired of rebuilding this calculation from scratch on every project. I put it into an Excel sheet: you enter the device list, it totals standby and alarm current, applies the correct duration case (non-voice, EVACS, or generator-backed) and the 25% margin, picks the next standard battery size for a 12 V or 24 V system, and PASS/FAIL-checks a size you choose yourself. It ships with a sources sheet that marks every rule with its edition and verification status, so you confirm the clauses against your own NFPA 72 copy before issue.
It's $19 here: NFPA 72 Battery Sizing Calculation Sheet
The same store has my other field tools: an NFPA 72 symbol library for AutoCAD (47 blocks with a layer scheme and legend sheet), a fire alarm BOQ pack for Excel, and an earthing & lightning protection calculation sheet: firealarmcad.gumroad.com
Happy to answer questions in the comments - especially if your AHJ enforces a different edition and you want to compare notes.

